Who this checklist is for

If you buy multifocal lenses in volume — as an optical retail chain, a distributor, or an eye care group running multiple locations — this is the procedure I run every time we onboard a new lens supplier. It is not theory. It is the seven-step process our team has used across roughly 200 orders over six years (maybe 180, I'd have to pull the system report). It is written for buyers who are tired of comparing quotes where the "cheap" option ends up costing more eighteen months later.

Seven steps. Twenty minutes to read, six weeks to run end-to-end the first time. After that, three or four weeks.

Step 1 — Lock the terminology before anyone sends a quote

Before a single RFQ goes out, get everyone — internal stakeholders, category managers, the supplier's rep — on the same page about what we're actually buying.

The difference between progressive and multifocal lenses gets muddled constantly in B2B correspondence. Progressive lenses are a type of multifocal lens. Multifocal is the broader category (which includes bifocals, trifocals, and progressives). If you send an RFQ that just says "multifocal lenses" without specifying, you will get quotes that range from basic bifocal stock to freeform progressive multifocal lenses, and the numbers will be meaningless side by side.

So we write it out. Something like: "Standard progressive multifocal lenses, 1.60 index, anti-reflective coating, add powers +1.00 to +3.00, corridor 14mm, stock range only." If your spec needs custom, say so explicitly.

Checkpoint: every supplier is quoting the same written spec. Not a verbal one.

Step 2 — Build a one-page spec sheet, not a price tag

It's tempting to think you can skip this and just collect prices. But identical-sounding specs from two suppliers can produce very different outcomes on the patient-facing side — and very different total cost on your P&L.

Our spec sheet fields:

  • Lens type (progressive / bifocal / trifocal — be precise)
  • Material and index
  • Coatings included vs. optional
  • Add power range required
  • Corridor length and minimum fitting height
  • Stock vs. custom (this is the biggest pricing divider)
  • Warranty terms on breakage and non-adapt

That last field is the one most buyers skip. If a supplier quotes you $X per pair but their non-adapt return policy is stricter than another vendor's, you're comparing two different products.

Step 3 — Send the same RFQ to 3+ suppliers, one delivery window

Three vendors minimum is our house rule. Not because three is magic, but because with two you're just comparing a quote and a counter-quote. With three you start to see the shape of the market.

The discipline that matters here: same delivery window across every RFQ. If you tell Vendor A "standard lead time" and Vendor B "need it in five working days," you are now pricing two different services and cannot compare the totals.

I don't have hard data on how much quote variance is "normal" industry-wide, but based on our own 40-odd RFQs over the years, my sense is that for an identical spec, the spread between the cheapest and most expensive quote typically lands somewhere between 25% and 40%. Once you normalize for lead time and coating inclusion, that spread usually collapses to 8-12%.

Step 4 — Run TCO math on every quote (this is where suppliers get annoyed)

Unit price is not the number that matters. TCO is. I learned this the hard way — in Q2 2024, we signed a supplier whose per-pair price was 11% below our incumbent. On paper, an $8,400 annual saving on our budget line. What the quote did not flag: a $450 handling fee per inbound shipment (which we hadn't asked about because the incumbent had waived it), a 60-day minimum replenishment cadence that forced us into stock we didn't need, and round-trip shipping that pushed the real cost to within 2% of the incumbent.

My TCO spreadsheet columns:

  1. Per-pair price
  2. Coatings included vs. billed separately
  3. Setup / onboarding / account fees
  4. Minimum order quantity and overage cost
  5. Freight in and out
  6. Breakage and non-adapt allowance
  7. Payment terms (yes, this is real cost — a 15-day term difference is worth roughly 1.5% at current short-term rates)

Run all seven steps for all three quotes before you open the negotiation email. If you skip step 4 and decide on unit price, you will win the first month and lose the eighteen after.

Step 5 — Screen for terminology fluency (this catches more problems than the price sheet ever will)

Whatever a sales rep says on the call is worth less than what they say when they think you're testing them. So in the second call, I ask two questions and listen for hesitation:

  • "How do you describe the difference between progressive and multifocal lenses to a new optometrist on our side?"
  • "Do you stock standard progressive multifocal lenses as inventory, or is everything freeform cut to order?"

A rep who can't answer the first question cleanly is a rep who hasn't been trained on the product they're selling. A rep who can't distinguish stock from freeform in the second is a rep whose quotes will not be reliable. From the outside, a lens supplier looks like a logistics operation — pallets in, pallets out. The reality is that a supplier who can't speak the language of progressive vs multifocal lenses will not catch spec errors before they ship.

Checkpoint: if either answer came with a hedge or an "I'll have to check," that's a flag — not an automatic disqualifier, but a flag.

Step 6 — Verify brand documentation, especially for Alcon multifocal lenses and other majors

If a supplier is quoting Alcon multifocal lenses, or any other branded product, ask for the authorized distribution chain in writing before you place a first order. Not a PDF that looks official — a document from the brand or their named distributor that names the supplier in the chain.

I'm not saying this to imply that unlicensed supply is common — I honestly don't have data on how often that goes wrong. What I can tell you is that in our category, brand authorization is the fastest way to close the loop on two things: warranty claims and recall handling. If a branded product has an issue and you can't produce the distribution chain, you're on your own for both.

For unbranded or private-label progressive multifocal lenses, the equivalent step is confirming the manufacturing origin and the factory's CE or FDA registration where applicable. Ask for the certificate, not the email that says "yes, we're certified."

Step 7 — Run a test order before you commit volume

This is the step 80% of buyers skip, and it's the one that saves the most money. It's also where the lead-time certainty premium lives, so let me be direct about it.

Every supplier will quote you a lead time. Two of them will hit it. One of them will say the right things and miss it by a week. A small test order — even 10-15% of your eventual volume — surfaces which is which before you've signed an annual agreement.

On urgency specifically: in March 2025, we paid a $400 rush premium on a lens order to guarantee same-week delivery on a re-stock cycle that would otherwise have hit our busiest fitting weekend of the quarter. That weekend was worth roughly $15,000 in booked appointments across two of our locations. I've never once regretted paying that $400. I've regretted paying $0 and missing a delivery window twice.

The trap is thinking rush fees are a red-line item to negotiate. They're not. What you negotiate is whether the guarantee is real — not whether the rush fee exists. "Probably on time" is the most expensive promise in this category.

Checkpoint: test order arrives on the promised day, at the promised spec, with the promised coating. Document all three. If any one fails, walk away — do not negotiate.

Common errors when running this checklist

Three things people get wrong once they've read a checklist like this and start applying it.

First: chasing the cheapest quote across mismatched specs. It's tempting to think that the number on the page is the number that matters. It isn't, if the spec is different by a coating tier or a corridor length.

Second: treating brand names as interchangeable. Alcon multifocal lenses, private-label progressive multifocal lenses, and stock lens imports are three different supply chains with three different economics. They don't belong in the same comparison table.

Third: skipping the sample order to save a month. The spreadsheet analysis will always push you toward the "sign now, sample later" route because it delays revenue less. My gut has been right more often than the spreadsheet on this one specific decision — and I say that as someone who lives in the spreadsheet. The test order is not optional if you're planning to commit to a full annual agreement.

One last thing on the post-decision side, because nobody writes about it: right after I approved our last supplier switch, I spent the next ten days second-guessing. What if their non-adapt rate was worse than the samples suggested? The three weeks until the first full-scale delivery were genuinely stressful. That doubt is normal and it does not mean the decision was wrong — but it does mean you should build in a buffer at the front of any new supplier relationship, not just at the back. My experience here is limited to mid-volume orders across optical retail and small distribution — if you're running high-volume direct-to-factory procurement, the timing may work differently. Verify with your own numbers.